Cryogenic tank low pressure control Figure 2
Like in Figure 1, the transmission through the cavity over the course of a one hour experiment, while the backpressure regulator is set up and running. Indicated by the black line is the start of filling of a cryostat in the same room as in Figure 1 and it shows that no disturbance of the system is visible.